Project Portfolio

Description of ProjectClientValueCompletion
On-Going Projects
J110 - Architectural Provisional Sum (APS) Works to Jurong East Station including A&A Works to the existing Jurong East Station for Jurong Region LineDL E&C $ 33,669,000In Progress
R1029 Ceiling Renewal for Existing NSL/EWL MRT Stations_Package B (10 Stations)LTA $ 24,200,000In Progress
Proposed Diversion And Relocation of Services/Facilities and Demolition of Existing Service Block at National University HospitalNational University Hospital $ 9,988,000In Progress
R1028 Ceiling Renewal for Existing NSL/EWL MRT Stations_Package A (14 Stations)LTA $ 35,000,000In Progress
CRL112 - A&A Works to Existing Hougang MRT StationSamsung C&T $ 16,000,000In Progress
T313 - Main Architectural Works to Xilin Station for Thomson-East Coast LineSamsung C&T $ 18,213,000In Progress
Past Projects
Design and Build New Bull Barn and Improvement Works to Wira's Exhibit & BOH at the Night SafariMandai Wildlife Group $ 4,217,0002025
DSTA A&A at Changi Naval Base & Tuas Naval BaseDSTA $ 9,900,0002025
C190 - Architectural Provisional Sum (APS) Works to Singapore Rail Testing CentreGS Engineering & Construction $ 16,160,0002025
Provision of Welding, Replacement of Bolts & Nuts, Translocation of Temporary Metal Container and Erection of New Office and Storeroom For Primate Holding (TAH)Mandai Park Development $ 364,0002025
Design and Build Improvement Works to Chawang Exhibit at The Night SafariMandai Wildlife Group $ 1,625,0002024
Proposed Childcare Centre at Level 4 and Play Area at Level 1 South, Terminal 3, Singapore Changi AirportChangi Airport Group $ 3,380,0002023
T307 - Main Architectural Works to Marine Parade Station for Thomson-East Coast LineSamsung C&T $ 25,800,0002024
T309 - Main Architectural Works to Siglap Station for Thomson-East Coast LineJohn Holland Zhen Hua JV $ 21,750,0002023
Project SGA - External Services and Ancillary BuildingsFortis Construction $ 41,750,0002024
Proposed Development of Giants of Asia Phase 1 at the Night SafariMandai Wildlife Group $ 10,510,0002023
Proposed New Erection of a 3-Storey Envelope Control Detached Dwelling House- $ 4,500,0002023
C04B3 - Superstructure Works for Admin Building at Global FoundriesExyte $ 7,435,0002022
T213 - A&A works to Caldecott Station for Thomson-East Coast LineSamsung C&T $ 1,200,0002022
T228 - Main Architectural Works to Gardens by the Bay Station for Thomson-East Coast LineNishimatsu Corporation $ 19,719,0002021
T212 - Pedestrian Overhead Bridge (36m) at Upper Thomson Station for Thomson-East Coast LineSato Kogyo $ 1,265,0002020
T225 - Artwork to Shenton Way Station for Thomson-East Coast LineShanghai Tunnel Engineering $ 238,0002020
T217 - Artwork to Napier Station for Thomson-East Coast LineSinohydro Corporation $ 300,0002020
T221 - Artwork to Havelock Station for Thomson-East Coast LineGammon Construction $ 110,0002020
T211 - Architectural Provisional Sum (APS) Works to Bright Hill Station for Thomson-East Coast LinePenta Ocean Construction $ 12,600,0002020
T210 - Architectural Provisional Sum (APS) Works to Mayflower Station for Thomson-East Coast LineGammon Construction $ 17,500,0002020
Design & Build of the Rhino Exhibit and Dens Facilities at the Night SafariMandai Wildlife Group $ 5,749,0002020
C9061 - Pedestrian Overhead Bridge (95m) at Gali Batu DepotHock Lian Seng $ 2,662,0002019
Contract 1401 - Infrastructure Enhancement Works Phase 3LTA $ 3,690,0002019
Design and Build of Viewing Deck and Ranger Station at Fishing Cat Trail located in Night SafariMandai Wildlife Group $ 471,0002019
New Shelter & Den and Improvement Works to the Malayan Tapir at Night SafariMandai Wildlife Group $ 653,0002018
Micron FAB 10A Project - C04B Substructure Works for Basement and CUP A-1Exyte $ 21,300,0002018
Architectural and External Works to Project Caps³ at Pioneer Turn (Package No. A01) for Givaudan Singapore Pte LtdGivaudan $ 2,777,0002018
Design and Build New Enclosure (Extension) for Orang Utan at Singapore Zoological GardensMandai Wildlife Group $ 432,0002018
Structural and Associated Works to Project Caps³ at Pioneer Turn (Package No. C01) for Givaudan Singapore Pte LtdGivaudan $ 2,990,0002018
Design and Build of Butterfly Aviary at Singapore Zoological GardensMandai Wildlife Group $ 279,0002018
NS1 - Design, Construction and Completion of North-South Transmission Cable Tunnel - Architectural WorksSamsung C&T $ 2,980,0002018
Cyclical Maintenance Programme and Addition and Alteration to Existing Children and Youth Complex at the Salvation Army (Gracehaven)Ministry of Social & Family Development $ 1,790,0002017
A&A Works to the Reptile House at Singapore Zoological GardensMandai Wildlife Group $ 2,180,0002017
C922 - Architectural Works to EXPO Station for DownTown Line Stage 3Samsung C&T $ 17,930,0002016
C922 - Artwork to EXPO Station for DownTown Line Stage 3Samsung C&T $ 340,0002016
3M - TUAS Singapore - C04 - Sub-structural WorksExyte $ 5,550,0002016
3M - TUAS Singapore - C07 - Superstructural WorksExyte $ 7,070,0002016
3M - TUAS Singapore - C60 - External WorksExyte $ 3,210,0002016
C930 - Architectural Works to UBI Station for DownTown Line Stage 3SK E&C $ 7,770,0002016
C931 - Architectural Works to MacPherson Station for Downtown Line Stage 3Hyundai E&C $ 15,350,0002016
Design and Build Improvement Works to the Shorebirds Exhibit at Jurong Bird ParkMandai Wildlife Group $ 315,0002016
Repairs and Redecoration Works to 5 Blocks at Block 11 Telok Blangah Crescent and Blocks104 to 107 Jalan Bukit MerahTanjong Pagar Town Council $ 1,530,0002015
ER295 - Pedestrian Overhead Bridge (36m) at Sentosa GatewaySato Kogyo $ 1,240,0002015
C918 - Architectural Provisional Sum (APS) Works to Tan Kah Kee Station for Downtown Line Stage 2SK E&C $ 12,000,0002015
C917A - Architectural Provisional Sum (APS) Works to Six Avenue Station and King Albert Park Station for Downtown Line Stage 2McConnell Dowell $ 24,500,0002015
C917A - Pedestrian Overhead Bridge at Sixth Avenue Station (75m) and King Albert Park Station (52m)McConnell Dowell $ 4,500,0002015
ER405 - Pedestrian Overhead Bridge (POB1-40m, POB2-40m) and Covered Linkway at Upper Paya Lebar RoadSwee Hong $ 2,545,0002015
Improvement Works to Singapore Zoo Comprising Sheltered Walkways, Pavilions and Footpaths for Singapore Zoological GardensMandai Wildlife Group $ 915,0002015
Repairs & Redecoration and Reroofing Works to 14 Blocks at Block 107 to 115 & 205 to 209 Lorong 1 Toa Payoh / Toa Payoh NorthBishan-Toa Payoh Town Council $ 5,228,0002015
Proposed Alterations and Additions to Existing Singapore Zoological Gardens Involving Erection of Elephant Barn & Wading Pool on Lot 01540K MK 14 at 80 Mandai Lake RoadMandai Wildlife Group $ 835,0002014
Proposed Erection of River Safari Cruise Boat Dock on Lot 01540K MK 14 at 80 Mandai Lake RoadMandai Wildlife Group $ 2,695,0002014
Supply and Installation of Precast Façade Cladding Works to Single-user 9-storey Data Center at Woodlands Avenue 8Obayashi Corporation $ 5,500,0002014
Sub & Super Sturcture Works to Single-user 9-storey Data Center at Woodlands Avenue 8Obayashi Corporation $ 21,850,0002014
C156 -Architectural Works to Marina South Pier Station at North South Line ExtensionSamsung C&T $ 11,920,0002014
ER377 Proposed Covered Pedestrian Overhead Bridge (40m), Covered Linkway and Bus Shelter at Upper Paya Lebar Road near Rochdale RoadLTA $ 2,662,0002013
Proposed 8-Storey Light Industrial Building with Cold Rooms at Basement Level, Warehouse and Maintenance Office Facilities at 3 Alexandra LaneKwang Yeow Heng Pte Ltd $ 21,700,0002013
Relocation of Indo-Malayan Region and Enlargement of Equatorial African Zone at Singapore Zoological GardensMandai Wildlife Group $ 3,965,0002012
C908 Architectural Provisional Sum (APS) Works to Cross Street MRT Station for Downtown Line Stage 1Samsung C&T $ 8,636,0002012
Proposed New Erection of 2 unit of 3-storey Semi-Detached Dwelling House at Wak Hassan Drive and 4 units of 3-storey Terrace Dwelling House with Basement at Kerong Walk- $ 4,414,0002012
ER276 - Upgrading of Bus Shelters (Package 2)LTA $ 5,295,0002012
IFF ASEAN SINGAPORE MASTERPLAN - Design, Supply and Installation of Civil, Structural, Architectural, Underground Services, Plumbing Sanitary and Gas System (C200)International Flavors & Fragrances (Greater Asia Pte Ltd) $ 17,500,0002012
ER306A - Proposed Covered Ramps and Roof Cover To Existing Pedestrian Overhead Bridge (Package 2)LTA $ 5,151,0002011
3M TUAS - C04A - SUBSTRUCTURAL WORKS - SG5/6 EXPANDSION & BUILDING 2Exyte $ 9,500,0002011
3M Woodlands - A&A Project C15 - Concrete Works & Architectural FinishesExyte $ 2,400,0002011
Project A - Construction of Propose Addition & Alteration to the Existing Part 2 -storey Factory / Part 2-storey Ancillary office at 55A Yishun Ind Park ASL Packaging Ind Pte Ltd $ 680,0002011
Proposed Erection of 4 Blocks of Single-Storey Food Establishment with open space car parks at Tebing Lane / Punggol EastAT Punggol Pte Ltd $ 2,291,0002010
Project - Direct Farm at Kendall Building Singapore - C21 Inteior Architectural WorksExyte $ 1,820,0002010
Civil, Structural and Architectural Works to No. 3 Tuas LoopExyte $ 1,223,0002010
A&A To Existing 2-storey Industrial Building at 280 Kampong Arang RoadPerformance Motors $ 5,100,0002010
Project - Direct Farm at Kendall Building Singapore - C07 - Structural WorksExyte $ 1,850,0002010
Medtronic Project at Changi South Avenue 2 - C60 External Works and C21 - Interior Architectural Works (Phase 1 & 2)Exyte $ 3,994,0002009
C60B External works / Lanscaping Package for Wyeth singapore S40 at Tuas.Exyte $ 708,0002009
REC WST Project - S5, S7, S8 & S10 Package - Slurry Building & Waste Water Treatment Building Substructure, Precast Concrete and Superstructure Installation.CH2M Hill $ 9,380,0002009
REC Module 3A - C07B - Insitu Super Structural Works Include Lift Cores, Stari cores, Structural Topping etc. at Tuas South Avenue 14 / Avenue 5Exyte $ 6,520,0002009
Proposed Cyclical Maintenance Programme to Pasir Ris Holiday Complex for People's AssociationPeople's Association $ 960,0002009
Construction of Cycling Track / Footpath at Sembawang New Town for Sembawang Town CouncilSembawang Town Council $ 1,181,0002009
Proposed Erection of a Single-User Industrial Development comprising a 2-storey Process Building, 2-storey Laboratory/Administration Building and other Ancillary Building at Ayer Merbau Road.Simon Carves Singapore $ 6,770,0002009
Norsun Ingot and wafering Plant (Singapore) - C04A - Substructure (Warehouse & Production Building and Gas Yard)Exyte $ 1,200,0002009
WYETH SINGAPORE S40 PROJECT - C10 - Structural Steel WorksExyte $ 900,0002008
WYETH SINGAPORE S40 PROJECT - C07B - Insitu Concrete worksExyte $ 820,0002008
Addition & Alteration Works to Existing Market and Hawker Centre at Blk 216 Bedok North Street for East Coast Town CouncilEast Coast Town Council $ 4,391,0002008
Repairs & Redecorations and Improvement works To 9 Blocks 124A, 124B, 125, 126 Bukit Merah View and Blocks 129 To 133 Clarence Lane.Tanjong Pagar Town Council $ 1,160,0002008
Addition & Alteration Works to Kampong Ubi Community Centre for kampong Ubi - Kembangan Citizen's Consultative CommitteeKampong Ubi - Kembangan CCC $ 480,0002008
Civil, Structural & Architectural Works for New Infrastructure Works at Basement 2, Cintech II at 75 Science Park Drive, Science Park 1.Kenyon Engrg Pte Ltd $ 1,200,0002008
WYETH SINGAPORE S40 PROJECT - C04A-Insitu Concrete works (Substructure) including Underground services Haunchings and Earthing/LightningExyte $ 2,400,0002008
Proposed Upgrading Works to Amphitheatre at Singapore Zoological Gardens.Mandai Wildlife Group $ 2,411,0002008
IMFS - FAB 10 - Construction of Sub-structure works for Soxal Gas YardExyte $ 1,985,0002008
IMFS - FAB 10 - Construction of Interior / Exterior Wet Works (C15C) at Admin BuildingExyte $ 2,583,0002008
IMFS - FAB 10 - C04B & 4C - Sub-Structural WorksExyte $ 10,029,0002007
Siltronic Samsung - FAB 300 - 3 Project - C21A - FAB Building Interior Architectural worksExyte $ 3,299,0002007
Siltronic Samsung - FAB 300 - 3 Project - C21C - Admin Building Interior Architectural worksExyte $ 2,695,0002007
Siltronic Samsung - FAB 300 - 3 Project - C04B - Sub-Structural WorksExyte $ 7,217,0002007